CTCaltrans Tracker
Home / Contracts / 10-1G5104

10-1G5104 — Bid Results

UPGRADE CURB RAMPS, SIDEWALK,

ON SR 12 FROM SOUTH STOCKTON STREET, POSTMILE 17.43 TO THE SB SR 99 RAMP JUNCTION POSTMILE 18.05 IN

Bid opened2022-05-25
District10
Engineer's estimate$2,260,000.00
Low bid$2,164,100.69 -4.24% vs EE
Low bidderCALIFORNIA HIGHWAY CONSTRUCTION GROUP, INC.
Number of bidders4
Working days105
Number of items65
SourceCaltrans bid summary PDF ↗

Bidders (4)

#BidderCity, StateBid amountvs Low
1 CALIFORNIA HIGHWAY CONSTRUCTION GROUP CONCORD, CA $2,164,100.69 +0.0%
2 FBD VANGUARD CONSTRUCTION, INC. LIVERMORE, CA $2,393,000.00 +10.6%
3 GEORGE REED, INC. MODESTO, CA $2,434,108.00 +12.5%
4 DIRT DYNASTY, INC. FARMINGTON, CA $2,993,400.00 +38.3%
Want the full picture? Caltrans Tracker breaks down every line item, compares subcontractor pricing across bidders, and models cost history against Caltrans's own bid data — free preview, no card required.
Open 10-1G5104 in Caltrans Tracker →
More bid openings from 2022-05-25:

CaltransTracker.com is an independent, privately owned data platform. It is not affiliated with, endorsed by, or operated by the California Department of Transportation (Caltrans) or the State of California. About · Privacy · Terms · Support this site