CTCaltrans Tracker
Home / Contracts / 11-2N2874

11-2N2874 — Bid Results

Rumble strip and shoulder repair.

SAN DIEGO COUNTY IN SAN DIEGO AND NATIONAL CITY FROM CAMINO DE LA PLAZA OVERCROSSING TO 0.5 MILE NORTH OF ROUTE 5/54 SEPARATION

Bid opened2026-04-30
District11
Engineer's estimate$690,000.00
Low bid$345,575.00 -49.92% vs EE
Low bidderV A P CONSTRUCTION INC.
Number of bidders5
Working days40
Number of items13
SourceCaltrans bid summary PDF ↗

Bidders (5)

#BidderCity, StateBid amountvs Low
1 V A P CONSTRUCTION INC. LA MIRADA, CA $345,575.00 +0.0%
2 CALMEX ENGINEERING, INC. BLOOMINGTON, CA $395,744.00 +14.5%
3 S&B ENGINEERING, INC. LAKESIDE, CA $426,681.00 +23.5%
4 AUTOBAHN CONSTRUCTION, INC. ORANGE, CA $481,180.00 +39.2%
5 MONTANO PIPELINE, INC. CHULA VISTA, CA $766,100.00 +121.7%
Want the full picture? Caltrans Tracker breaks down every line item, compares subcontractor pricing across bidders, and models cost history against Caltrans's own bid data — free preview, no card required.
Open 11-2N2874 in Caltrans Tracker →
More bid openings from 2026-04-30:

CaltransTracker.com is an independent, privately owned data platform. It is not affiliated with, endorsed by, or operated by the California Department of Transportation (Caltrans) or the State of California. About · Privacy · Terms · Support this site