CTCaltrans Tracker
Home / Contracts / 07-0Y2004

07-0Y2004 — Bid Results

Wrong way driver preventive counter measures and pedestrian.

LOS ANGELES COUNTY AT VARIOUS LOCATIONS

Bid opened2025-05-07
District07
Engineer's estimate$550,000.00
Low bid$494,126.00 -10.16% vs EE
Low bidderAUTOBAHN CONSTRUCTION, INC.
Number of bidders6
Working days75
Number of items17
SourceCaltrans bid summary PDF ↗

Note: this bid summary's PDF text was unreadable (scanned/corrupt encoding); figures were recovered via OCR from the page images. Verify critical numbers against the source PDF.

Bidders (6)

#BidderCity, StateBid amountvs Low
1 AUTOBAHN CONSTRUCTION, INC. ORANGE, CA $494,126.00 +0.0%
2 WGJ ENTERPRISES, INC. DBA PCI AZUSA, CA $535,699.50 +8.4%
3 CAL STRIPE, INC. COLTON, CA $549,000.00 +11.1%
4 CAT TRACKING, INC. RIVERSIDE, CA $563,920.00 +14.1%
G B A ENGINEERING YORBA LINDA, CA $490,871.00 -0.7%
BC RENTALS, LLC DBA BC TRAFFIC SPECIALIST GARDEN GROVE, CA $471,760.00 -4.5%
Want the full picture? Caltrans Tracker breaks down every line item, compares subcontractor pricing across bidders, and models cost history against Caltrans's own bid data — free preview, no card required.
Open 07-0Y2004 in Caltrans Tracker →
More bid openings from 2025-05-07:

CaltransTracker.com is an independent, privately owned data platform. It is not affiliated with, endorsed by, or operated by the California Department of Transportation (Caltrans) or the State of California. About · Privacy · Terms · Support this site