CTCaltrans Tracker
Home / Contracts / 06-0V7804

06-0V7804 — Bid Results

INSTALL FIBER OPTIC SYSTEM

IN FRESNO COUNTY ON ROUTE 41 PM R20.00/33.37, ROUTE 99 PM 19.36/ 22.0, ROUTE 168 PM R0.2/R9.7, AND

Bid opened2021-10-19
District06
Engineer's estimate$14,000,000.00
Low bid$11,071,828.20 -20.92% vs EE
Low bidderALDRIDGE ELECTRIC, INC.
Number of bidders3
Working days230
Number of items24
SourceCaltrans bid summary PDF ↗

Bidders (3)

#BidderCity, StateBid amountvs Low
1 ALDRIDGE ELECTRIC, INC. LIBERTYVILLE, IL $11,071,828.20 +0.0%
2 ST. FRANCIS ELECTRIC, LLC SAN LEANDRO, CA $14,017,700.00 +26.6%
3 PTM GENERAL ENGINEERING SERVICES, INC. RIVERSIDE, CA $23,667,067.00 +113.8%
Want the full picture? Caltrans Tracker breaks down every line item, compares subcontractor pricing across bidders, and models cost history against Caltrans's own bid data — free preview, no card required.
Open 06-0V7804 in Caltrans Tracker →
More bid openings from 2021-10-19:

CaltransTracker.com is an independent, privately owned data platform. It is not affiliated with, endorsed by, or operated by the California Department of Transportation (Caltrans) or the State of California. About · Privacy · Terms · Support this site