04-3J0704 — Bid Results
Remove PCC and AC, place PCP and AC Resurfacing.
CONTRA COSTA COUNTY IN HERCULES AND CROCKETT FROM ROUTE 80/4 SEPARATION TO 0.1 MILE WEST OF CROCKETT VIADUCT
| Bid opened | 2023-02-07 |
| District | 04 |
| Engineer's estimate | $60,000,000.00 |
| Low bid | — -28.45% vs EE |
| Low bidder | |
| Number of bidders | 4 |
| Working days | 275 |
| Number of items | 108 |
| Source | Caltrans bid summary PDF ↗ |
Want the full picture? Caltrans Tracker breaks down every line item, compares subcontractor pricing across bidders, and models cost history against Caltrans's own bid data — free preview, no card required.
Open 04-3J0704 in Caltrans Tracker →
More bid openings from 2023-02-07:
- 06-1A3204 — Remove guardrail, pave HMA pad and construct concrete median barrier. (low bid $3.9M)
- 10-1H5304 — Construct maintenance vehicle pullout and gore paving. (low bid $2.3M)
- 12-0T3904 — Clean CA beautification and safety project. (low bid $974K)
- 12-0T6604 — Cold plane AC Pvmt and place RHMA. (low bid $4.5M)
CaltransTracker.com is an independent, privately owned data platform. It is not affiliated with, endorsed by, or operated by the California Department of Transportation (Caltrans) or the State of California. About · Privacy · Terms · Support this site